Show simple item record

contributor authorRonie Navon
date accessioned2017-05-08T21:12:38Z
date available2017-05-08T21:12:38Z
date copyrightJanuary 1997
date issued1997
identifier other%28asce%290887-3801%281997%2911%3A1%2817%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42881
description abstractThis paper discusses the need for automatic data extraction, processing, and transfer [computer-aided design and computer-aided manufacturing (CAD/CAM) interfacing] between the design and construction phases as a key element in computer-integrated construction (CIC). The CAD/CAM interface eliminates the need for manual interfacing between these two computer-aided phases. The CAD/CAM interface improves the process of the constructed facility realization by eliminating the manual data processing and thereby reducing many sources of errors. It also makes the process more cost-effective because it reduces labor inputs, especially those presently invested in robot programming. A model for automatic data extraction, processing, and transfer is proposed for the tile-setting paradigm. The model generates construction management data as well as data needed for automatic on-site construction (robotics). The model is implemented in the AutoCAD and AutoLISP environments. The model and the implementation system were tested in the laboratories with a scaled robot adapted to perform interior finishing tasks.
publisherAmerican Society of Civil Engineers
titleCOCSY II: CAD/CAM Integration for On-Site Robotics
typeJournal Paper
journal volume11
journal issue1
journal titleJournal of Computing in Civil Engineering
identifier doi10.1061/(ASCE)0887-3801(1997)11:1(17)
treeJournal of Computing in Civil Engineering:;1997:;Volume ( 011 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record