contributor authorAhmed B. Senouci
contributor authorNeil N. Eldin
date accessioned2017-05-08T21:12:35Z
date available2017-05-08T21:12:35Z
date copyrightApril 1996
date issued1996
identifier other%28asce%290887-3801%281996%2910%3A2%28106%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42848
description abstractThis paper presents a nonserial dynamic programming formulation for the scheduling of linear projects with nonsequential activities. One of the major advantages of the approach presented is its ability to handle both serial and nonserial linear projects with activities performed with variable crew formations. The presented formulation determines the optimum crew size for production activities that lead to the minimum project total cost. An example project is provided in order to illustrate the computational steps, validate the calculation algorithm, and show the capabilities of the proposed method.
publisherAmerican Society of Civil Engineers
titleDynamic Programming Approach to Scheduling of Nonserial Linear Project
typeJournal Paper
journal volume10
journal issue2
journal titleJournal of Computing in Civil Engineering
identifier doi10.1061/(ASCE)0887-3801(1996)10:2(106)
treeJournal of Computing in Civil Engineering:;1996:;Volume ( 010 ):;issue: 002
contenttypeFulltext