Show simple item record

contributor authorYuan Sun
contributor authorYaren Xu
contributor authorJiping Guo
contributor authorHongyou Cao
date accessioned2022-05-07T20:27:38Z
date available2022-05-07T20:27:38Z
date issued2022-5-1
identifier other(ASCE)BE.1943-5592.0001859.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4282460
description abstractThe buckling–anchorage system (BAS) is critical in the construction of cantilever casting concrete arch bridges. However, due to the limitations of the anchor positions, the BAS always needs a trade-off between material cost and construction safety. This paper proposes a cost optimization method for BAS while considering the safety requirements of the structure during the erection process. The proposed framework couples particle swarm optimization with the numerical simulation of the erection process. The optimization model considers the height of the pylon and the anchorage interval of the buckle cables as design variables with constructional safety constraints. The internal force balanced method is utilized to determine the anchorage–buckling cable forces to reduce the structural analysis cost of the optimization. The numerical investigation based on a real arch bridge demonstrates the feasibility of the proposed approach and shows valuable suggestions to the design of BAS for similar applications.
publisherASCE
titleConstructional Safety-Based Cost Optimization for the Buckling–Anchorage System of Cantilever Casting Concrete Arch Bridges
typeJournal Paper
journal volume27
journal issue5
journal titleJournal of Bridge Engineering
identifier doi10.1061/(ASCE)BE.1943-5592.0001859
journal fristpage04022022
journal lastpage04022022-15
page15
treeJournal of Bridge Engineering:;2022:;Volume ( 027 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record