Show simple item record

contributor authorJunyu Chen
contributor authorHung-Lin Chi
contributor authorQianru Du
contributor authorPeng Wu
date accessioned2022-05-07T19:58:22Z
date available2022-05-07T19:58:22Z
date issued2022-03-21
identifier other(ASCE)ME.1943-5479.0001044.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4281860
description abstractSafe operation of cranes is essential in the construction industry to ensure continuous gains in productivity and control potential hazards to workers on construction sites. In this research, which was based on human-machine-environment (HME) system thinking, a structured crane-related accident database was developed to identify and prioritize the safety concerns of construction crane operators. In order to technically investigate risk factors from accident reports, an approach was proposed in this work integrating factor clustering and prioritization. Accordingly, the research methodology was designed to first collect crane-related accident cases and determine database variables, including accident types, contributing operational factors, and accident consequences. Second, an advanced multiple correspondence analysis (MCA) method coupled with the fuzzy logic was applied to distribute the variables into different clusters and visualize their associations. Third, once the variables were well clustered, failure mode and effect analysis (FMEA) was adopted to investigate the multiscaled structure of clustering and explore the priorities of failure modes based on current legislation, regulations, and industrial codes of practice. In summary, the proposed approach integrating clustering analysis and prioritization analysis contributes to determining essential safety concerns and their potential impacts during crane operation, generating implications for construction crane safety management and eliciting detailed managerial implementation strategies for prevention measures for crane accidents in the construction industry.
publisherASCE
titleInvestigation of Operational Concerns of Construction Crane Operators: An Approach Integrating Factor Clustering and Prioritization
typeJournal Paper
journal volume38
journal issue4
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)ME.1943-5479.0001044
journal fristpage04022020
journal lastpage04022020-18
page18
treeJournal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record