Show simple item record

contributor authorJinying Xu
contributor authorWeisheng Lu
contributor authorEleni Papadonikolaki
date accessioned2022-05-07T19:56:28Z
date available2022-05-07T19:56:28Z
date issued2022-01-31
identifier other(ASCE)ME.1943-5479.0001013.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4281831
description abstractThe sluggish adoption of building information modeling (BIM) is attributable to various technical, managerial, personnel, procedural, and institutional issues encountered by an organization in which such adoption takes place. However, these issues are under researched from a holistic perspective. Based on a proposed human-organization-technology (HOT) fit model, this paper aims to study the impacting factors of HOT fit in BIM adoption within construction project organizations (CPOs). The HOT fit indexes of 14 BIM case projects were operationalized using social network analysis (SNA) method and how different factors impact the HOT fit and its three subdimensions [i.e., human-technology (HT) fit, organization-technology (OT) fit, and human-organization (HO) fit] was investigated using a comparative case study. It was found that the project size has significantly negative relations with HOT fit, HT fit, and OT fit; while hierarchy steepness has positive correlations with HT fit, OT fit, and HO fit. OT fit was also found to have a weakly negative relationship with BIM level of details (LODs). A joint factor analysis further disclosed that the flatter the hierarchy, the larger the project size, and the higher the BIM LOD, the more difficult to achieve a high HOT fit, HT fit, or OT fit. Thus, CPOs should use steeper hierarchical structure and take a progressive BIM adoption strategy by adopting from smaller projects and/or lower LODs. This research empirically examined how project organizational and technological factors can impact BIM adoption. The HOT fit model can help CPOs evaluate their general HOT fit status, redesign optimal HOT configuration, diagnose the problems when the HOT fit is not ideal, and make strategic directions to better harvest the benefits of BIM. Limitations and future research directions are also identified.
publisherASCE
titleHuman-Organization-Technology Fit Model for BIM Adoption in Construction Project Organizations: Impact Factor Analysis Using SNA and Comparative Case Study
typeJournal Paper
journal volume38
journal issue3
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)ME.1943-5479.0001013
journal fristpage04022004
journal lastpage04022004-15
page15
treeJournal of Management in Engineering:;2022:;Volume ( 038 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record