Show simple item record

contributor authorAhmed Badr
contributor authorAhmed Yosri
contributor authorSonia Hassini
contributor authorWael El-Dakhakhni
date accessioned2022-02-01T21:59:27Z
date available2022-02-01T21:59:27Z
date issued12/1/2021
identifier other%28ASCE%29IS.1943-555X.0000649.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4272428
description abstractHydropower dams are critical infrastructure systems characterized by their complex, dynamic, and stochastic behaviors. The frequent variation in the hydrological and meteorological variables poses a higher probability of dam failure, highlighting the need to improve pertinent risk assessment approaches to predict failure risks, considering the uncertain states of such variables. Bayesian networks (BN) analysis has been a key risk assessment tool for decades; however, BN’s static acyclic nature is a recognized drawback. In this paper, a continuous-time Markov chain (CTMC) is coupled with a BN model to enable the dynamic assessment of dam failure risk. In this respect, BN is used to represent the interrelation among the system variables and simulate the propagation of uncertainties throughout the system, whereas the CTMC is adopted to describe the continuous transition of the system variables over their respective states. To demonstrate its applicability, the developed coupled BN-CTMC model was employed to predict the probability of failure of the Daisy Lake Dam in the province of British Columbia, Canada, under the uncertainty of reservoir water level, inflow, and wind speed states. The developed BN-CTMC modeling approach can aid in the development of reliable dam operation schemes and risk mitigation strategies through (1) adequately representing the propagation of the hydrological (e.g., inflow and reservoir water level) and meteorological (e.g., wind speed) variable uncertainties through dam system dynamical processes; (2) effectively quantifying dam failure risk under different operational conditions and failure scenarios; (3) accurately specifying the critical periods of dam system operational safety; and (4) providing in-depth understanding of the relationships between the dam system’s failure and associated variables over time.
publisherASCE
titleCoupled Continuous-Time Markov Chain–Bayesian Network Model for Dam Failure Risk Prediction
typeJournal Paper
journal volume27
journal issue4
journal titleJournal of Infrastructure Systems
identifier doi10.1061/(ASCE)IS.1943-555X.0000649
journal fristpage04021041-1
journal lastpage04021041-14
page14
treeJournal of Infrastructure Systems:;2021:;Volume ( 027 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record