Show simple item record

contributor authorYongcan Huang
contributor authorMinh Tri Trinh
contributor authorTuyen Le
date accessioned2022-02-01T00:12:09Z
date available2022-02-01T00:12:09Z
date issued8/1/2021
identifier other%28ASCE%29CO.1943-7862.0002116.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4271074
description abstractDespite the risk of occupational hearing loss, many noise-exposed construction workers are unwilling to wear hearing protection devices (HPDs) due to their concern about the degraded audibility of environmental sounds. Augmented hearing protection technology that uses advanced artificial intelligenc–based signal processing to amplify safety-critical sounds offers great potential to address the issue. To facilitate the acceptance of this new technology, it is critical to understand the user’s intention of use of augmented HPDs. The current state-of-the-art, however, offers little understanding about the user’s intention of use of such new technology. This paper fills the gap by exploring factors that determine the user’s intention of use of augmented HPDs in the construction environment. Data were collected using questionnaires from 298 practitioners in the US, China, and Japan. The structural equation modeling (SEM) method was adopted for analyzing the collected data. The results denote that the intention of use of augmented hearing protection technology is determined by the user’s perceived usefulness of which the perceived ease of use, hearing health, and safety consciousness, trust on autonomy are among the most critical factors. The findings of this study enrich understandings of the theories of technology adoption in construction. It presents a further step towards critical design and implementation considerations for the success of augmented hearing protection technology in the future.
publisherASCE
titleCritical Factors Affecting Intention of Use of Augmented Hearing Protection Technology in Construction
typeJournal Paper
journal volume147
journal issue8
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0002116
journal fristpage04021088-1
journal lastpage04021088-16
page16
treeJournal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 008
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record