contributor author | Suraj V. Gaikwad | |
contributor author | Maria Calahorra-Jimenez | |
contributor author | Keith R. Molenaar | |
contributor author | Cristina Torres-Machi | |
date accessioned | 2022-02-01T00:11:51Z | |
date available | 2022-02-01T00:11:51Z | |
date issued | 7/1/2021 | |
identifier other | %28ASCE%29CO.1943-7862.0002104.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl1/handle/yetl/4271067 | |
description abstract | Traditional design–bid–build guidelines suggest that engineering estimates should be within +/−10% of the lowest contractor bid and recommend this value as a reference to identify anomalies in the bidding process. This guidance, however, neglects delivery approaches such as design–build (D–B). This research examines 305 D–B highway projects procured using best-value and identifies the underlying reasons for bid dispersion and cost estimates inaccuracies. This study found an average bid dispersion of 27%, suggesting that a larger threshold (i.e., 25%) is needed to account for the inherent variability of D–B projects. This study also found that engineering estimates are on average 2% more than the awarded price. This result contradicts findings in existing literature and suggests that current practice in D–B best-value may be more conservative than other procurement methods. The study explores four potential reasons for bid dispersion and engineering estimate inaccuracies and suggests strategies for improvement. By providing a better understanding of bid dispersion and engineering estimate accuracy, this study will ultimately assist in the development of new policies and processes for D–B best-value projects. | |
publisher | ASCE | |
title | Challenges in Engineering Estimates for Best Value Design–Build Highway Projects | |
type | Journal Paper | |
journal volume | 147 | |
journal issue | 7 | |
journal title | Journal of Construction Engineering and Management | |
identifier doi | 10.1061/(ASCE)CO.1943-7862.0002104 | |
journal fristpage | 04021065-1 | |
journal lastpage | 04021065-10 | |
page | 10 | |
tree | Journal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 007 | |
contenttype | Fulltext | |