Show simple item record

contributor authorXiaobo Chen
contributor authorYuanyuan Zhang
contributor authorBinyan Zhao
contributor authorShuting Yang
date accessioned2022-02-01T00:09:43Z
date available2022-02-01T00:09:43Z
date issued5/1/2021
identifier other%28ASCE%29CO.1943-7862.0002032.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4271007
description abstractInvestment estimation is a key component of early decision-making for a construction project, which is crucial to the project cost control. Currently, most investment estimation researches render the point value results, which could lead to considerable uncertainty in the estimation results and increase the risk of decision-making. Therefore, it is essential to explore a type of systematic, accurate, and effective estimation method. This study proposed an innovative estimation method of probability interval prediction based on the distribution of prediction errors. First, the dimension reduction of the construction indexes was conducted by using exploratory factor analysis (EFA). Then, a model was developed based on the fusion of the support vector regression (SVR) and grey wolf optimization (GWO) algorithm. Finally, cost intervals with different confidence levels were obtained on the basis of kernel density estimation (KDE). The case results indicated that when the confidence was 95%, the comprehensive evaluation index coverage width-based criterion (CWC) and the interval coverage rate PICC of the cost estimation were 2.17 and 93.33%, respectively. Hence, the proposed interval prediction model was fairly reliable, which could provide practical guidance for the investment decisions in the early stage of construction projects and give the decision makers more abundant forecasting information.
publisherASCE
titleInvestment Probabilistic Interval Estimation for Construction Project Using the Hybrid Model of SVR and GWO
typeJournal Paper
journal volume147
journal issue5
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0002032
journal fristpage04021031-1
journal lastpage04021031-13
page13
treeJournal of Construction Engineering and Management:;2021:;Volume ( 147 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record