Show simple item record

contributor authorMohammad Hossein Zehtab Yazdi
contributor authorMorteza Raissi Dehkordi
contributor authorMahdi Eghbali
contributor authorGholamreza Ghodrati Amiri
date accessioned2022-01-30T22:43:13Z
date available2022-01-30T22:43:13Z
date issued2/1/2021
identifier other(ASCE)NH.1527-6996.0000411.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4269473
description abstractThe first and most important step in preparing a seismic retrofit plan for existing buildings is the analysis of seismic risk by conducting studies on retrofitting and preparing qualitative and quantitative reports. The existing buildings in the city of Tehran, Iran, urgently require retrofit studies for a number of reasons including the high seismicity of the region, updating of structural and seismic codes, and so on. In such studies, identifying the conditions of buildings categorized as first priority in the seismic retrofit plan, especially vital places for public use such as schools, is of utmost significance. The present paper proposes a detailed seismic risk prioritization process for steel school buildings using a hierarchical structure through a fuzzy inference system method and applies it to a case study on steel school buildings in Tehran. This study aims at drawing on a seismic risk prioritization method using a fuzzy model based on a solid, efficient, and complete structure for steel school buildings, and its results as a case study indicate the number of Tehran’s school buildings with high seismic risk requiring retrofit studies.
publisherASCE
titleFuzzy-Based Seismic Risk Prioritization of Steel School Buildings
typeJournal Paper
journal volume22
journal issue1
journal titleNatural Hazards Review
identifier doi10.1061/(ASCE)NH.1527-6996.0000411
journal fristpage04020044
journal lastpage04020044-16
page16
treeNatural Hazards Review:;2021:;Volume ( 022 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record