Show simple item record

contributor authorHiwa Hamid
contributor authorMi G. Chorzepa
contributor authorStephan A. Durham
date accessioned2022-01-30T21:28:10Z
date available2022-01-30T21:28:10Z
date issued12/1/2020 12:00:00 AM
identifier other%28ASCE%29CF.1943-5509.0001523.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4268254
description abstractA large number of cracks were observed in a bridge seal structure during an underwater inspection. The seal is 13.2  m long, 5.9  m wide, and 6.8  m deep and thus is considered mass concrete. The concrete mixture contains a 45% cement replacement with Class F fly ash. The seal is evaluated to identify the causes of cracking. The heat of hydration (HoH) and temperature rise are experimentally evaluated. Subsequently, a finite-element analysis model is developed using input from the experimental study. The modeling approach is validated with results from sizeable specimens. A coupled thermal-structural analysis is performed to evaluate the temperature-time history and extent of cracking. The results indicate internal temperature in the seal slightly exceeds the allowable temperature of 70°C, which is known for exposing concrete to the risk of delayed ettringite formation. The gradient temperature exceeds the allowable limit of 19.4°C, leading to increased tensile strain. A sensitivity analysis indicates that two mixtures that contain a 70% cement replacement with slag, metakaolin, and/or fly ash are recommended for reducing the internal temperature below 70°C. However, it is concluded that the differential temperature requirement (19.4°C) cannot be met by altering material designs alone. Therefore, active cooling is necessary to control temperature when placing underwater seal structures with a volume-to-surface-area ratio greater than 4.0.
publisherASCE
titleInvestigation of Cracks Observed in Underwater Bridge Seal Structures and Crack Control by Means of Material Design
typeJournal Paper
journal volume34
journal issue6
journal titleJournal of Performance of Constructed Facilities
identifier doi10.1061/(ASCE)CF.1943-5509.0001523
page13
treeJournal of Performance of Constructed Facilities:;2020:;Volume ( 034 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record