Show simple item record

contributor authorYouyou Zhang
contributor authorY. H. Chai
date accessioned2022-01-30T21:02:03Z
date available2022-01-30T21:02:03Z
date issued12/1/2020 12:00:00 AM
identifier other%28ASCE%29BE.1943-5592.0001646.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4267539
description abstractThis paper studies the feasibility of replacing damaged deck of posttensioned concrete box-girder bridges without the use of falsework to support the superstructure span. Parameters of the study included straight, curved, and skewed bridges, and simple versus multispan bridges. Deck replacement in posttensioned box-girder bridges requires special attention because the deck forms an integral part of the load-resisting mechanism and large precompression has been locked in by the posttensioning in the superstructure. The potential unfavorable stress reversals or redistribution during deck replacement should be carefully considered. In this study, practical options for lane closure and traffic rerouting were incorporated into the replacement strategies, and these options included temporal longitudinal and transverse replacements. Additionally, time-dependent properties for concrete and steel representatives of current construction practice were included in the finite-element model. Results indicated that full-depth deck replacement may be difficult and undesirable because the current AASHTO stress limits were violated in all four of the posttensioned box-girder bridges selected for the study. Additionally, the increase in permanent deflections through deck replacement was relatively large for these selected bridges, which is likely to result in degraded ride quality, safety, and poor drainage condition for the bridge. As a general trend, critical stresses at the top of the web and downward deflection of the girders were found to accumulate as the deteriorated deck was removed and a new deck cast.
publisherASCE
titleBridge Deck Replacement of Posttensioned Concrete Box-Girder Bridges
typeJournal Paper
journal volume25
journal issue12
journal titleJournal of Bridge Engineering
identifier doi10.1061/(ASCE)BE.1943-5592.0001646
page15
treeJournal of Bridge Engineering:;2020:;Volume ( 025 ):;issue: 012
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record