description abstractThe construction of a 140-m spanned arch bridge adopted an innovative launching method in which the steel superstructure with a total weight of 2,120 t was entirely assembled and erected on the south side, and then launched northward to span the watercourse. A special hydraulic crawler machinery system was used to drive the launch. Temporary structural and geotechnical facilities, including four launching tracks and their supporting foundations and structures, were designed and implemented. Many investigations were conducted to study the structural and/or geotechnical behaviors related to the launch process and the temporary facilities. In situ geotechnical load tests were carried out for the design of the supporting foundations. The elevations of the superstructure and the temporary facilities were monitored to ensure their vertical alignment. The surface strain in the steel elements of the superstructure and in the launching rails was measured in real time. The results of these investigations are presented, and the lessons learned are discussed.
publisherASCE
titleInnovative Launch of Long-Span Arch Bridge Across Waterway Using Special Hydraulic Crawler
typeJournal Paper
journal volume25
journal issue3
journal titlePractice Periodical on Structural Design and Construction
identifier doi10.1061/(ASCE)SC.1943-5576.0000496
page14
treePractice Periodical on Structural Design and Construction:;2020:;Volume ( 025 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record