Show simple item record

contributor authorPedram Ghannad
contributor authorYong-Cheol Lee
contributor authorCarol J. Friedland
contributor authorJin Ouk Choi
contributor authorEunhwa Yang
date accessioned2022-01-30T19:52:01Z
date available2022-01-30T19:52:01Z
date issued2020
identifier other%28ASCE%29ME.1943-5479.0000799.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4266109
description abstractWidespread destruction from large-scale disasters results in lengthy and costly recovery of damaged infrastructure and communities, with societal and economic impacts persisting many years after a hazard event. Robust and coherent reconstruction planning and rapid execution play pivotal roles in ameliorating time-consuming postdisaster recovery. Reconstruction generally constitutes a considerable portion of an entire disaster recovery process that requires significant resources, including materials, workforce, funding, time, and others. To pursue maximum socioeconomic benefits, which can be one of the critical goals of the postdisaster recovery process, optimized recovery strategies should be designed by considering given federal, state, and local resources. Even though recent studies have proposed disaster recovery planning and execution models, they rarely addressed social and economic indicators required for comprehensive postdisaster recovery plans. This paper presents a new postdisaster recovery prioritization model, including social and economic factors, that evaluates priorities of damaged facilities recovery projects in affected regions through a resource allocation analysis. The primary goal of the proposed model is to optimize resource allocation and quantify and maximize socioeconomic benefits for a postdisaster reconstruction project portfolio through multicriteria decision analysis and multiobjective optimization. Also, this research study adopts a modular construction technique as a potential solution for facilitating the recovery processes, which can significantly reduce their time and cost. The proposed model is expected to provide a comprehensive decision-making process for researchers and practitioners to design a postdisaster recovery plan and arrange their available resources by considering the socioeconomic factors of affected communities.
publisherASCE
titleMultiobjective Optimization of Postdisaster Reconstruction Processes for Ensuring Long-Term Socioeconomic Benefits
typeJournal Paper
journal volume36
journal issue4
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)ME.1943-5479.0000799
page04020038
treeJournal of Management in Engineering:;2020:;Volume ( 036 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record