Show simple item record

contributor authorMichael Anson
contributor authorMing-Fung Francis Siu
date accessioned2022-01-30T19:22:14Z
date available2022-01-30T19:22:14Z
date issued2020
identifier other%28ASCE%29CO.1943-7862.0001796.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4265169
description abstractMatching site concrete-placing resources with the appropriate number of concrete-delivery truckmixers depends upon good site and concrete plant coordination if good concreting productivity is to be achieved. In general practice, however, the placing crew usually is idle for some of the pour time waiting for deliveries, and at other times, truckmixers are idle on site waiting to be emptied. In the case of concrete supplied by a circulating fleet of truckmixers, which is a balance point process, two new diagram models were developed relating fleet size to the parameters of placing-crew idle time, truckmixer idle time, truckmixer unloading time, round-trip time, and concrete-placing production rate. The new models augment classical balance point theory. To illustrate practical application: (1) the diagrams were developed and used to reveal system behavior insights for the case of three circulating truckmixers, and (2) the relevance of the new model to a real pour of 46 deliveries was examined in relation to the balancing of site and plant resources for better coordination and system productivity.
publisherASCE
titleAugmented Balance Point Diagrams for Matching Site and Concrete-Supply Resources
typeJournal Paper
journal volume146
journal issue4
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0001796
page04020021
treeJournal of Construction Engineering and Management:;2020:;Volume ( 146 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record