Show simple item record

contributor authorD. Negussey
contributor authorL. Andrews
contributor authorS. Singh
contributor authorC. Liu
date accessioned2019-09-18T10:39:11Z
date available2019-09-18T10:39:11Z
date issued2019
identifier other%28ASCE%29PS.1949-1204.0000377.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4259850
description abstractA growing number of large culverts in the national transportation network are in poor condition. Often, aging infrastructures carry heavy traffic through urban corridors. Either after failure or for replacement, reconstruction must occur rapidly to minimize service disruption. In some cases, new materials are used and uncommon construction practice is followed. The I-88 culvert crossing of Carrs Creek in Sidney, New York completely collapsed during record flooding. Rapid construction using expanded polystyrene (EPS) geofoam blocks as lightweight fill enabled partial reopening of I-88 in less than 3 months of closure. Shortly after reopening of the roadway, rapid and continuing settlements became evident. The roadway was again rebuilt using lightweight aggregates as structural fill above the culvert following complete removal of the geofoam blocks. This investigation of the rapid construction failure reexamines the findings and recommendations of a prior study of the failure. Alternative conclusions and suggestions for improving rapid construction practice with geofoam are presented utilizing the I-88 failure as an example in retrospect.
publisherAmerican Society of Civil Engineers
titleForensic Investigation of a Wide Culvert Reconstruction Failure
typeJournal Paper
journal volume10
journal issue3
journal titleJournal of Pipeline Systems Engineering and Practice
identifier doi10.1061/(ASCE)PS.1949-1204.0000377
page05019001
treeJournal of Pipeline Systems Engineering and Practice:;2019:;Volume ( 010 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record