contributor authorMohamed Magdy
contributor authorMaged Georgy
contributor authorHesham Osman
contributor authorMoheeb Elsaid
date accessioned2019-09-18T10:38:46Z
date available2019-09-18T10:38:46Z
date issued2019
identifier other%28ASCE%29LA.1943-4170.0000293.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4259755
description abstractDelays are common on projects of all types, sizes, and locations. A full understanding of the impact of a delay and its consequences for various contracting parties is required as part of a proper contract administration process, and it is necessary to prevent lengthy disputes and litigation. The large number of available critical path method delay analysis methodologies (DAMs) and lack of consistency in their application motivated this research to better understand the use of DAMs in the Egyptian construction industry. The research relied on a triangulation approach that combined quantitative data and statistical analysis from a survey of 93 firms with qualitative feedback from 9 domain experts. Analysis of the results shows clear trends in the use of particular DAMs and differences in awareness of DAMs among contractors and consultants. The research further provides a better understanding of the use and level of understanding of DAMs and the criteria used to select them in the Egyptian construction industry.
publisherAmerican Society of Civil Engineers
titleDelay Analysis Methodologies Used by Engineering and Construction Firms in Egypt
typeJournal Paper
journal volume11
journal issue3
journal titleJournal of Legal Affairs and Dispute Resolution in Engineering and Construction
identifier doi10.1061/(ASCE)LA.1943-4170.0000293
page04519006
treeJournal of Legal Affairs and Dispute Resolution in Engineering and Construction:;2019:;Volume ( 011 ):;issue: 003