Show simple item record

contributor authorDarwish Mohamed;Elsayed Ahmed Yehia;Nassar Khaled
date accessioned2019-02-26T07:55:32Z
date available2019-02-26T07:55:32Z
date issued2018
identifier other%28ASCE%29CO.1943-7862.0001449.pdf
identifier urihttp://yetl.yabesh.ir/yetl1/handle/yetl/4250313
description abstractThe commercially used systems of formworks and falseworks currently used in construction require high initial cost, take time to be erected, and occupy major space in the construction site. The proposed new system depends on developing a new falsework system depending on the concept of the funicular arch. A parametric study is performed proving that the proposed funicular arched steel truss (FAST) system decreases the own weight of the falsework. FAST was proven to save up to half of the falsework steel in addition to eliminating the need for stringers and therefore decreasing the initial cost compared with commercially used systems. A time study is also performed in order to assess the time efficiency of the construction system, which proved to save two-thirds of the falsework installation time. Further, the new system is proven to be environmentally friendly because it decreases half of the CO2 emitted to air due to steel falsework fabrication in addition to saving transportation time and cost and providing more space in the construction site. A case study is also included in which the soundness of the system is proven from different perspectives.
publisherAmerican Society of Civil Engineers
titleDesign and Constructability of a Novel Funicular Arched Steel Truss Falsework
typeJournal Paper
journal volume144
journal issue3
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0001449
page4018002
treeJournal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record