description abstractThe critical path method is an essential tool for project planning, control, and scheduling. But when it is applied to analyze the critical path of project networks with fuzzy activity durations, two key issues need to be settled properly: sorting fuzzy numbers and avoiding the fuzzy subtraction operation to generate negative, infeasible solutions. In view of this, this study proposes an improved fuzzy critical path method. The primary contributions this research makes to the body of knowledge are as follows: an integrated vector similarity algorithm is used to resolve the sorting problem of fuzzy durations, while the improved standard algorithm for fuzzy subtraction is to circumvent the negative, infeasible solutions generated in fuzzy subtraction operation; moreover, this method analyzes and depicts the change of critical path under the fuzzy state of activity duration, which fills the knowledge gaps. The empirical analysis indicates that the inference and computation of this method are relatively objective and easy to implement, the effectiveness and practicability of which are further verified in practice.
publisherAmerican Society of Civil Engineers
titleImproved Critical Path Method with Trapezoidal Fuzzy Activity Durations
typeJournal Paper
journal volume144
journal issue9
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)CO.1943-7862.0001541
page4018090
treeJournal of Construction Engineering and Management:;2018:;Volume ( 144 ):;issue: 009
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record