Show simple item record

contributor authorEva O. L. Lantsoght
contributor authorRutger T. Koekkoek
contributor authorCor van der Veen
contributor authorDick A. Hordijk
contributor authorAne de Boer
date accessioned2017-12-30T13:03:53Z
date available2017-12-30T13:03:53Z
date issued2017
identifier other%28ASCE%29BE.1943-5592.0001131.pdf
identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4245234
description abstractFor existing bridges, proof-load testing can be a suitable assessment method. This paper addresses the evaluation of a posted reinforced concrete slab bridge over a highway through proof-load testing, detailing the preparation, execution, and analysis of the test. As the target proof-load and the required measurements for proof-load testing currently are not well-defined in the existing codes, this pilot case was used to develop and evaluate proposed recommendations for proof-load testing for a future guideline on proof-load testing for the Netherlands. Moreover, the pilot proof-load test is used to study the feasibility of proof-load testing for both shear and flexure.
publisherAmerican Society of Civil Engineers
titlePilot Proof-Load Test on Viaduct De Beek: Case Study
typeJournal Paper
journal volume22
journal issue12
journal titleJournal of Bridge Engineering
identifier doi10.1061/(ASCE)BE.1943-5592.0001131
page05017014
treeJournal of Bridge Engineering:;2017:;Volume ( 022 ):;issue: 012
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record