description abstractMost reported project management studies to identify major factors in construction delay are based on self-administered questionnaire surveys of the views of project participants. A small number of studies are based on the records of actual construction projects. No study of major delay factors based on the analysis of extension of time of construction projects has been reported in the literature. A study on project management in public housing construction and delay factors based on extensions of time for 184 high-rise apartment blocks of the public housing agency in Singapore is reported herein. A comparison of major delay factors identified by this study with those identified in an earlier study is reported. Comparison is also made with studies for Hong Kong, South Korea, and Taiwan. Measures to improve the schedule performance of the development of public housing projects with respect to the delay factors identified are proposed in this paper.
publisherAmerican Society of Civil Engineers
titleProject Management and Delay Factors of Public Housing Construction
typeJournal Paper
journal volume23
journal issue1
journal titlePractice Periodical on Structural Design and Construction
identifier doi10.1061/(ASCE)SC.1943-5576.0000350
page04017028
treePractice Periodical on Structural Design and Construction:;2018:;Volume ( 023 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record