Show simple item record

contributor authorXin Zou
contributor authorQian Zhang
contributor authorLihui Zhang
date accessioned2017-12-30T12:56:58Z
date available2017-12-30T12:56:58Z
date issued2018
identifier other%28ASCE%29ME.1943-5479.0000565.pdf
identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4243799
description abstractThis study investigates the deadline satisfaction problem in line-of-balance (LOB) scheduling, where each activity can be done concurrently in several units by hiring additional crews, and all employed crews are allocated to implement an activity in sequential units smoothly with no interruption. Furthermore, the project must be completed within a given deadline. In previous studies, the objective was to minimize the total number of crews under the assumption that the cost of hiring a crew is the same for all activities. In fact, this cost usually differs among activities because of the differences in type of work, crew size, and technical level of workers. This paper presents a mixed-integer linear programming model with an extended objective of minimizing the crew employment cost of all activities. The model is equipped with an exact procedure to validate the feasibility of a prespecified deadline. A highway project was used to show the application of the proposed method, and then extensive computational experiments were conducted to investigate the performance of the proposed method by comparing the obtained results with those obtained by the existing methods. The results highlight the significance of integrating the time-cost trade-off analysis, and indicate that the proposed method can find optimal solutions for large-scale projects within a reasonable amount of time.
publisherAmerican Society of Civil Engineers
titleModeling and Solving the Deadline Satisfaction Problem in Line-of-Balance Scheduling
typeJournal Paper
journal volume34
journal issue1
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)ME.1943-5479.0000565
page04017044
treeJournal of Management in Engineering:;2018:;Volume ( 034 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record