Show simple item record

contributor authorNian Sheng Cheng
contributor authorYee Meng Chiew
contributor authorXingwei Chen
date accessioned2017-12-30T12:53:58Z
date available2017-12-30T12:53:58Z
date issued2016
identifier other%28ASCE%29EM.1943-7889.0001107.pdf
identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4243109
description abstractThis study presents a scaling analysis of the time development of clear-water scour depth at bridge piers. It shows that the widely-used exponential formula can be theoretically derived with scaling arguments. The derivation provides connections between the physical pier-scouring process and two empirical constants used in the formula. The dependence of the two constants on sediment coarseness is calibrated using published laboratory data with scour duration ranging from 49 to 1094 h. The analysis presented is restricted to conditions, including steady flow, clear-water scour, narrow circular cylindrical pier, and uniform sediment with low coarseness.
publisherAmerican Society of Civil Engineers
titleScaling Analysis of Pier-Scouring Processes
typeJournal Paper
journal volume142
journal issue8
journal titleJournal of Engineering Mechanics
identifier doi10.1061/(ASCE)EM.1943-7889.0001107
page06016005
treeJournal of Engineering Mechanics:;2016:;Volume ( 142 ):;issue: 008
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record