Show simple item record

contributor authorVasily Titov
contributor authorUtku Kânoğlu
contributor authorCostas Synolakis
date accessioned2017-12-16T09:15:20Z
date available2017-12-16T09:15:20Z
date issued2016
identifier other%28ASCE%29WW.1943-5460.0000357.pdf
identifier urihttp://138.201.223.254:8080/yetl1/handle/yetl/4240563
description abstractThe development, testing, and implementation of a real-time tsunami forecast model, the method of splitting tsunami (MOST), is described. MOST is now used as an operational forecast model for the National Oceanic and Atmospheric Administration’s Tsunami Warning System, and as a tsunami hazard assessment tool in the United States and in many countries around the world. Every step in the development of MOST marked new scientific challenges, improvements of technological and computational capabilities, and new demands of the engineering and hazard mitigation communities for applied and benchmark modeling tools for tsunami hazard assessment.
publisherAmerican Society of Civil Engineers
titleDevelopment of MOST for Real-Time Tsunami Forecasting
typeJournal Paper
journal volume142
journal issue6
journal titleJournal of Waterway, Port, Coastal, and Ocean Engineering
identifier doi10.1061/(ASCE)WW.1943-5460.0000357
treeJournal of Waterway, Port, Coastal, and Ocean Engineering:;2016:;Volume ( 142 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record