Show simple item record

contributor authorLegg, T. P.
contributor authorMylne, K. R.
date accessioned2017-06-09T17:34:44Z
date available2017-06-09T17:34:44Z
date copyright2007/02/01
date issued2007
identifier issn0882-8156
identifier otherams-87468.pdf
identifier urihttp://onlinelibrary.yabesh.ir/handle/yetl/4231140
description abstractIn an earlier paper the authors described the use of ensemble information for the generation of early warnings of defined severe-weather events within the United Kingdom. A comprehensive verification of the system was also included in this study. However, an error was later found within the verification code for relative operating characteristic and reliability, which affects most of the results (though the Brier skill scores were not affected). The purpose of the present corrigendum is to provide amended verification results. Briefly, what was found before was that skill appeared to exhibit a maximum for these severe-weather events at 4 days ahead, but, although the results for day 4 remain good, the authors underestimated the skill at other days and so the 4-day skill maximum is no longer clear; instead, skill is useful at days 1?4, and tails off only slowly at days 5?6.
publisherAmerican Meteorological Society
titleCORRIGENDUM
typeJournal Paper
journal volume22
journal issue1
journal titleWeather and Forecasting
identifier doi10.1175/WAF1003.1
journal fristpage216
journal lastpage219
treeWeather and Forecasting:;2007:;volume( 022 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record