Show simple item record

contributor authorEsther Malini
date accessioned2017-05-08T21:11:35Z
date available2017-05-08T21:11:35Z
date copyrightJuly 1999
date issued1999
identifier other%28asce%290742-597x%281999%2915%3A4%2851%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/42221
description abstractThe build operate transfer scheme can be advantageously adopted by municipal administrations in India for implementing transport infrastructure projects, such as the construction of bridges, without undue strain on their declining budgetary resources. The simulation model developed by the writer permits the examination of the financial viability of any proposed build operate transfer transport infrastructure project, as affected by various options relating to the toll structure, toll revision schedule, extent of the municipal grant, and duration of the concession period. A realistic case study of a municipal bridge project illustrates the application of the simulation model.
publisherAmerican Society of Civil Engineers
titleBuild Operate Transfer Municipal Bridge Projects in India
typeJournal Paper
journal volume15
journal issue4
journal titleJournal of Management in Engineering
identifier doi10.1061/(ASCE)0742-597X(1999)15:4(51)
treeJournal of Management in Engineering:;1999:;Volume ( 015 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record