Show simple item record

contributor authorMcQuigg, James D.
contributor authorDecker, Wayne L.
date accessioned2017-06-09T16:28:18Z
date available2017-06-09T16:28:18Z
date copyright1962/06/01
date issued1962
identifier issn0021-8952
identifier otherams-6847.pdf
identifier urihttp://onlinelibrary.yabesh.ir/handle/yetl/4210033
description abstractIf an outdoor job were being planned in an area which never received precipitation, all facilities could be scheduled with assurance that work could proceed to completion without interruption because of precipitation. In practice, many an outdoor job has been scheduled, only to be delayed several times before actual completion. It would be useful to be able to estimate the probability of completing a job as scheduled. A mathematical model is developed which includes: (1) A scheduled beginning date, (2) An amount of precipitation in one day that would interrupt a job, (3) The number of days of ?drying out? time required, (4) The number of work days required. For a particular place and job, the problem is to estimate the probability that a run of dry days will occur during a particular period of time. This could be estimated by counting runs in a sample period, or computed by several methods. In this study probabilities were computed by an approximation technique which yielded estimates comparable to those from counts of actual runs. Probability estimates for different beginning dates and lengths of drying and work periods are presented.
publisherAmerican Meteorological Society
titleThe Probability of Completion of Outdoor Work
typeJournal Paper
journal volume1
journal issue2
journal titleJournal of Applied Meteorology
identifier doi10.1175/1520-0450(1962)001<0178:TPOCOO>2.0.CO;2
journal fristpage178
journal lastpage183
treeJournal of Applied Meteorology:;1962:;volume( 001 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record