Show simple item record

contributor authorXiaohui Yuan
contributor authorYongchuan Zhang
contributor authorYanbin Yuan
date accessioned2017-05-08T21:08:22Z
date available2017-05-08T21:08:22Z
date copyrightJuly 2008
date issued2008
identifier other%28asce%290733-9496%282008%29134%3A4%28319%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/40161
description abstractThe short-term optimal hydrogeneration planning is a complicated nonlinear constrained optimization problem with water delay time. To overcome the shortcomings of a standard genetic algorithm, this paper proposes a new real-value encoding self-adaptive chaotic genetic algorithm to solve this problem, which designs a new crossover operator in light of probability distribution function and a self-adaptive chaotic mutation operator combined chaotic dynamic character with artificial neural network theory. Constraints can be dealt with by using a simple direct comparison penalty function method without the need of any penalty coefficient. The feasibility of the proposed method is demonstrated for short-term generation scheduling of two test hydrosystems and the test results are compared with those obtained by the standard genetic algorithm in terms of solution quality and convergence characteristic. The simulation results show that the proposed method is capable of obtaining higher quality solutions.
publisherAmerican Society of Civil Engineers
titleImproved Self-Adaptive Chaotic Genetic Algorithm for Hydrogeneration Scheduling
typeJournal Paper
journal volume134
journal issue4
journal titleJournal of Water Resources Planning and Management
identifier doi10.1061/(ASCE)0733-9496(2008)134:4(319)
treeJournal of Water Resources Planning and Management:;2008:;Volume ( 134 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record