Show simple item record

contributor authorPer‐Ola Karlsson
contributor authorYacov Y. Haimes
date accessioned2017-05-08T21:06:31Z
date available2017-05-08T21:06:31Z
date copyrightMay 1989
date issued1989
identifier other%28asce%290733-9496%281989%29115%3A3%28299%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/38961
description abstractThe safety of many existing dams could be improved by modifying hem structurally in accordance with recent advances in statistical hydrology and mproved availability of meteorological and hydrological data. Any increase insafety that might be gained by structural changes must be balanced against their costs. The risk analysis methodology known as the partitioned multiobjective risk method (PMRM) is explored in this paper through a dam‐safety problem. The PMRM is well suited to the task of solving the probabilistic optimization problem posed by such risk‐versus‐cost considerations. With the PMRM, a number of conditional expected‐damage functions are generated. Of these, one that represents events of a more extreme and catastrophic character is of particular interest here. The close relationship that exists between the expectation of damage and the statistics of extremes is shown to simplify the implementation of the PMRM, and the relationship also permits the derivation of closed‐form equations that determine (for any partitioning of the probability axis) the expected damage, given that a flood with a return period that equals or exceeds
publisherAmerican Society of Civil Engineers
titleRisk Assessment of Extreme Events: Application
typeJournal Paper
journal volume115
journal issue3
journal titleJournal of Water Resources Planning and Management
identifier doi10.1061/(ASCE)0733-9496(1989)115:3(299)
treeJournal of Water Resources Planning and Management:;1989:;Volume ( 115 ):;issue: 003
contenttypeFulltext