description abstractExistence of several problems associated with the optimization of real‐time operations of reservoir systems is demonstrated. The first problem presented is due to the use of imperfect streamflow (inflow to the reservoir) forecasts. It is shown that there is a significant relationship between the reliability of the forecast information and the operating or forecast horizon to be used in the model. To illustrate the implications of this relationship, an example is given where extending the forecast horizon beyond three days does not improve the performance of the model for real‐time operations. Real‐time operations models often require routing models that relate reservoir releases to the flows at downstream points. It is illustrated with examples that use of approximate reach routing models may cause unexpected problems and may mislead the decision makers. A method to partially resolve the problem is also suggested.
publisherAmerican Society of Civil Engineers
titleProblems with Modeling Real‐Time Reservoir Operations
typeJournal Paper
journal volume111
journal issue4
journal titleJournal of Water Resources Planning and Management
identifier doi10.1061/(ASCE)0733-9496(1985)111:4(367)
treeJournal of Water Resources Planning and Management:;1985:;Volume ( 111 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record