contributor authorPraveen Sukumaran
contributor authorTaeHoon Hong
contributor authorMehmet Emre Bayraktar
contributor authorMakarand Hastak
date accessioned2017-05-08T21:04:52Z
date available2017-05-08T21:04:52Z
date copyrightAugust 2006
date issued2006
identifier other%28asce%290733-947x%282006%29132%3A8%28638%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/37907
description abstractThere are currently no standard or accepted methods in the construction industry to calculate the probable impact of indirect cost factors on the schedule of highway work zone projects. This paper presents a model for stochastic analysis of factors affecting construction schedule in highway work zones and determination of probable changes, i.e., reduction or escalation, in the original estimated schedule for a given project. Also, three case studies from the Indiana Department of Transportation are illustrated in this paper in order to show the applicability of the model as a forecasting tool for predicting schedule changes on state Department of Transportation projects.
publisherAmerican Society of Civil Engineers
titleValidation of a Model for Predicting Schedule Changes in Highway Work Zones—Case Studies
typeJournal Paper
journal volume132
journal issue8
journal titleJournal of Transportation Engineering, Part A: Systems
identifier doi10.1061/(ASCE)0733-947X(2006)132:8(638)
treeJournal of Transportation Engineering, Part A: Systems:;2006:;Volume ( 132 ):;issue: 008
contenttypeFulltext