description abstractA summary of construction cost and scheduling information is presented for four maglev guideway designs on an example route from Baltimore, MD to Newark, N.J. This work results from the National Maglev Initiative (NMI), a government-industry effort from 1989 to 1994. The system design concepts used as a basis for developing cost and construction scheduling information, were submitted by four industry consortia solely for this analysis, and represent their own unpublished designs. The detailed cost and construction schedule analyses cover the main guideway only. A summary estimate was made for stations, power distribution systems, maintenance facilities, and other types of infrastructure. The results of the analyses indicate a number of design aspects which must receive further consideration by future designers. These aspects will affect the practical and economic construction and long-term maintenance of a high-speed maglev guideway.
publisherAmerican Society of Civil Engineers
titleMaglev Guideway Cost and Construction Schedule Assessment
typeJournal Paper
journal volume123
journal issue3
journal titleJournal of Transportation Engineering, Part A: Systems
identifier doi10.1061/(ASCE)0733-947X(1997)123:3(195)
treeJournal of Transportation Engineering, Part A: Systems:;1997:;Volume ( 123 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record