Show simple item record

contributor authorLeland S. Riggs
date accessioned2017-05-08T21:03:22Z
date available2017-05-08T21:03:22Z
date copyrightJune 1988
date issued1988
identifier other%28asce%290733-9364%281988%29114%3A2%28279%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/36953
description abstractThe speed with which the Construction Management (CM) system has entered the daily practices of the construction industry has caught educators in a lag. The management of construction and construction management were considered synonymous until construction management became a formal contracting system. Educators designed construction education programs around the needs of the general contractor and the requirements of the general contracting system. As CM became popular, educators began teaching the CM process but have not yet totally modified instructional programs to accommodate the unique requirements of construction managers. This paper establishes the differences between the educational requirements of a contracting‐oriented program and a construction management‐oriented program with respect to the management tools and the philosophy of those using the tools.
publisherAmerican Society of Civil Engineers
titleEducating Construction Managers
typeJournal Paper
journal volume114
journal issue2
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1988)114:2(279)
treeJournal of Construction Engineering and Management:;1988:;Volume ( 114 ):;issue: 002
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record