Show simple item record

contributor authorTien Fang Fwa
contributor authorKumares C. Sinha
contributor authorJohn D. N. Riverson
date accessioned2017-05-08T21:02:26Z
date available2017-05-08T21:02:26Z
date copyrightSeptember 1988
date issued1988
identifier other%28asce%290733-947x%281988%29114%3A5%28539%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/36399
description abstractThis paper describes a mathematical programming procedure for routine maintenance activities at the network level developed for incorporation into the existing pavement maintenance‐management system of Indiana. The procedure allows a highway agency to determine amounts of different routine maintenance activity types to be performed over a given time period under the constraints of production requirements, budget allocation, manpower, material and equipment availability, and pavement rehabilitation schedule. A priority‐weighting factor is assigned to each maintenance work so that higher‐priority work would be selected for execution. Rehabilitation constraints are included to ensure proper coordination between the selected routine maintenance activities and planned rehabilitation projects. An integer programming optimization model is developed for the proposed procedure. The types of data required and their acquisition are discussed. A numerical example based upon routine maintenance information obtained from the Indiana Department of Highways is presented as an illustration.
publisherAmerican Society of Civil Engineers
titleHighway Routine Maintenance Programming at Network Level
typeJournal Paper
journal volume114
journal issue5
journal titleJournal of Transportation Engineering, Part A: Systems
identifier doi10.1061/(ASCE)0733-947X(1988)114:5(539)
treeJournal of Transportation Engineering, Part A: Systems:;1988:;Volume ( 114 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record