Show simple item record

contributor authorR. Kenneth Wolfe
contributor authorGeorge L. Heath
contributor authorDavid C. Colony
date accessioned2017-05-08T21:01:51Z
date available2017-05-08T21:01:51Z
date copyrightJanuary 1983
date issued1983
identifier other%28asce%290733-947x%281983%29109%3A1%28137%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/36054
description abstractDuring cold wealther periods, asphalt concrete highway construction is frequently postponed because the hot asphalt concrete cools too rapidly for proper compaction to take place. If the cooling rates and asphalt concrete temperatures for hot asphalt could be predicted as a function of time, then construction on many cold weather days could proceed when construction would otherwise be prohibited. A simple predictive method is available on a hand‐held Hewlett‐Packard 97 programmable calculator. The research reported in this paper tests the predictive method by comparing predicted temperatures with measured temperatures under both laboratory and field conditions. The predictive method proves satisfactory for predicting cooling curves up to 20 min. Reported also are the laboratory measures of thermophysical properties of typical asphalt concrete and base materials encountered in Ohio.
publisherAmerican Society of Civil Engineers
titleCooling Curve Prediction of Asphaltic Concrete
typeJournal Paper
journal volume109
journal issue1
journal titleJournal of Transportation Engineering, Part A: Systems
identifier doi10.1061/(ASCE)0733-947X(1983)109:1(137)
treeJournal of Transportation Engineering, Part A: Systems:;1983:;Volume ( 109 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record