Show simple item record

contributor authorW. F. Teskey
contributor authorR. J. Fox
contributor authorD. H. Adler
date accessioned2017-05-08T21:01:42Z
date available2017-05-08T21:01:42Z
date copyrightNovember 2004
date issued2004
identifier other%28asce%290733-9453%282004%29130%3A4%28179%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/35917
description abstractPrecise heighting by the hidden point bar method is investigated. The investigation includes development of the mathematical model, calibration of the hidden point bar, and comparison with precise leveling and precise trig heighting. The method is applied in the field at a coal-fired electric power generating plan. Both the field application and the comparison with precise leveling and precise trig heighting indicated that the level of precision is on the order of
publisherAmerican Society of Civil Engineers
titleHidden Point Bar Method for Precise Heighting
typeJournal Paper
journal volume130
journal issue4
journal titleJournal of Surveying Engineering
identifier doi10.1061/(ASCE)0733-9453(2004)130:4(179)
treeJournal of Surveying Engineering:;2004:;Volume ( 130 ):;issue: 004
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record