Show simple item record

contributor authorLarry E. Stanfel
date accessioned2017-05-08T21:01:22Z
date available2017-05-08T21:01:22Z
date copyrightAugust 1994
date issued1994
identifier other%28asce%290733-9453%281994%29120%3A3%28130%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/35724
description abstractThe conventional units of surveying distance, the chain and the link, have been in use for about 200 years. Yet, for an important class of survey operations, halving distances, the units become fractional after very few bisections, so that it is impossible to reckon small distances in whole numbers of units. Furthermore, it is recognized that people are loath to adopt new systems of measurements if their units differ conspicuously from the old, familiar ones. The present paper suggests a new system of two units, the new link and the new chain, that are compatible with the old units' magnitudes and that allow much higher accuracy to be expressed solely in terms of integral numbers of units. An additional feature of the new system is a useful binary representation. With the considerable interest in geographic databases and information systems, the ability to compute rapidly with such units is important. The easy binary representation of distance in the new units satisfies this requirement.
publisherAmerican Society of Civil Engineers
titleSurvey Distance Units: A Better Way
typeJournal Paper
journal volume120
journal issue3
journal titleJournal of Surveying Engineering
identifier doi10.1061/(ASCE)0733-9453(1994)120:3(130)
treeJournal of Surveying Engineering:;1994:;Volume ( 120 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record