Show simple item record

contributor authorReinaldo Morales
contributor authorRobert Ettema
contributor authorBrian Barkdoll
date accessioned2017-05-08T20:46:09Z
date available2017-05-08T20:46:09Z
date copyrightJune 2008
date issued2008
identifier other%28asce%290733-9429%282008%29134%3A6%28800%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/26523
description abstractLaboratory tests using a large-scale model of a spill-through bridge abutment led to important findings about the performance of a riprap apron as an abutment scour countermeasure. Riprap stone is widely used for protecting side slopes of embankments against erosion, and several design guidelines are available in the literature. In contrast, only a few guidelines exist for the design of a riprap apron around an abutment. These guidelines focus only on the armoring effect of riprap, neglecting other effects. This study shows that apron performance involves several mechanisms: armoring the bed, dissipating large-scale turbulence shed from the abutment, reducing the peak unit discharge, reducing the average shear stress, and shifting the scour region away from the abutment. Together, these mechanisms substantially reduce the maximum scour depth. The test findings are compared with those from a much smaller model of riprap-apron performance.
publisherAmerican Society of Civil Engineers
titleLarge-Scale Flume Tests of Riprap-Apron Performance at a Bridge Abutment on a Floodplain
typeJournal Paper
journal volume134
journal issue6
journal titleJournal of Hydraulic Engineering
identifier doi10.1061/(ASCE)0733-9429(2008)134:6(800)
treeJournal of Hydraulic Engineering:;2008:;Volume ( 134 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record