Show simple item record

contributor authorTae Hwan Chung
contributor authorYasser Mohamed
contributor authorSimaan AbouRizk
date accessioned2017-05-08T20:45:35Z
date available2017-05-08T20:45:35Z
date copyrightAugust 2006
date issued2006
identifier other%28asce%290733-9364%282006%29132%3A8%28882%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/26176
description abstractSimulation models are built on assumptions, approximations, and estimates. Repetitive long-term projects such as tunnel construction provide opportunities to finetune approximations based on input from actual project progress. Bayesian updating techniques are an effective approach for improving the quality of simulation input and output based on what has already been observed. This paper presents a case study in which Bayesian techniques were applied to a simulation model of an actual tunnel project, the North Edmonton Sanitary Trunk. The study shows that using Bayesian techniques greatly improves the quality of projections. The novelty of this work includes the enhancement of the application of Bayesian updating techniques, the demonstration of simulation applications with a fully monitored tunneling project, and the demonstration of the extent of improvement to planning predictions from the use of actual data and the Bayesian updating techniques.
publisherAmerican Society of Civil Engineers
titleBayesian Updating Application into Simulation in the North Edmonton Sanitary Trunk Tunnel Project
typeJournal Paper
journal volume132
journal issue8
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2006)132:8(882)
treeJournal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 008
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record