Show simple item record

contributor authorTavakoli Amir
date accessioned2017-05-08T20:45:35Z
date available2017-05-08T20:45:35Z
date copyrightSeptember 1986
date issued1986
identifier other%28asce%290733-9364%281986%29112%3A3%28403%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/26175
description abstractThe increasing competition in the construction industry today not only calls for lower bid prices but for accurate estimates as well. Therefore, a contractor must continuousiy strive to improve his or her estimating techniques. A computer simulation which can be used to estimate the loss in efficiency that results when a dual cycle system is being started up each shift is presented. It does this by using the CYCLONE simulation model for several different simulated cases.
publisherAmerican Society of Civil Engineers
titleTransient Response Analysis of a Dual Cycle System
typeJournal Paper
journal volume112
journal issue3
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1986)112:3(403)
treeJournal of Construction Engineering and Management:;1986:;Volume ( 112 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record