description abstractThe owner-responsibility system is conducted for implementation of the Three Gorges Project (TGP). For the construction management of the project, the contracting system, the contract administration system, and the construction supervision system are executed for the project management. Contractors for civil projects are determined through bidding and contracting. The permanent equipment and construction materials are purchased through bidding. Some of large-sized construction machines and mechanical and electrical equipment are procured by the international competitive bids. Qualified engineers from qualified engineering bodies, scientific research organizations, and construction companies are selected for the construction supervision. This paper covers the construction of the TGP in some detail, particularly the main dam structure, diversion work, the construction program, and management, project cost, and financing.
publisherAmerican Society of Civil Engineers
titleManagement and Construction of the Three Gorges Project
typeJournal Paper
journal volume132
journal issue6
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2006)132:6(615)
treeJournal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record