Show simple item record

contributor authorRong-yau Huang
contributor authorKuo-Shun Sun
date accessioned2017-05-08T20:44:57Z
date available2017-05-08T20:44:57Z
date copyrightJune 2006
date issued2006
identifier other%28asce%290733-9364%282006%29132%3A6%28585%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/25798
description abstractRepetitive scheduling methods are more effective than traditional critical path methods in the planning and scheduling of repetitive construction projects. Nevertheless, almost all the repetitive scheduling methods developed so far have been based on the premise that a repetitive project is comprised of many identical production units. In this research a non-unit-based algorithm for the planning and scheduling of repetitive projects is developed. Instead of repetitive production units, repetitive or similar activity groups are identified and employed for scheduling. The algorithm takes into consideration: (1) the logical relationship of activity groups in a repetitive project; (2) the usage of various resource crews in an activity group; (3) the maintaining of resource continuity; and (4) the time and cost for the routing of resource crews. A sample case study and a case study of a sewer system project are conducted to validate the algorithm, as well as to demonstrate its application. Results and findings are reported.
publisherAmerican Society of Civil Engineers
titleNon-Unit-Based Planning and Scheduling of Repetitive Construction Projects
typeJournal Paper
journal volume132
journal issue6
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2006)132:6(585)
treeJournal of Construction Engineering and Management:;2006:;Volume ( 132 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record