Show simple item record

contributor authorEul-Bum Lee
contributor authorJohn T. Harvey
contributor authorDavid Thomas
date accessioned2017-05-08T20:40:57Z
date available2017-05-08T20:40:57Z
date copyrightDecember 2005
date issued2005
identifier other%28asce%290733-9364%282005%29131%3A12%281283%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/23364
description abstractThe California Department of Transportation is rehabilitating or reconstructing deteriorated urban freeways using long-life (30+ years) strategies. These pavements were constructed between 1955 and 1970 with design lives of 20 years. This paper summarizes preconstruction analysis of the fast-track pavement reconstruction on Interstate-15 (I-15) at Devore which used two one-roadbed continuous (about 210 h) closures with round-the-clock
publisherAmerican Society of Civil Engineers
titleIntegrated Design/Construction/Operations Analysis for Fast-Track Urban Freeway Reconstruction
typeJournal Paper
journal volume131
journal issue12
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2005)131:12(1283)
treeJournal of Construction Engineering and Management:;2005:;Volume ( 131 ):;issue: 012
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record