description abstractConstruction materials management is generally recognized to be the integrated coordination of materials takeoff, purchasing, expediting, receiving, warehousing and distribution. When these functions are not properly managed, materials shortages, surpluses, and cash flow problems are likely to occur. Costly labor delays result when the required quantity or quality of materials are not available when needed. The attributes of materials management systems are discussed and the essential elements of a successful system identified. Owner‐contractor, engineer‐contractor, and home office‐project site communications appear to be critical to the success of the materials management effort. Preconstruction materials planning and personnel orientation and training are also important. The complex online computer programs that are used to coordinate the materials management effort are costly, but essential, if the desired degree of control is to be exerted to prevent potential shortages, surpluses, and cash flow problems.
publisherAmerican Society of Civil Engineers
titleAttributes of Materials Management Systems
typeJournal Paper
journal volume112
journal issue1
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1986)112:1(14)
treeJournal of Construction Engineering and Management:;1986:;Volume ( 112 ):;issue: 001
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record