Show simple item record

contributor authorAhmed B. Senouci
contributor authorNeil N. Eldin
date accessioned2017-05-08T20:39:47Z
date available2017-05-08T20:39:47Z
date copyrightDecember 2004
date issued2004
identifier other%28asce%290733-9364%282004%29130%3A6%28869%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/22754
description abstractThis paper presents an augmented Lagrangian genetic algorithm model for resource scheduling. The algorithm considers scheduling characteristics that were ignored in prior research. Previous resource scheduling formulations have primarily focused on project duration minimization. Furthermore, resource leveling and resource-constrained scheduling have traditionally been solved independently. The model presented here considers all precedence relationships, multiple crew strategies, total project cost minimization, and time-cost trade-off. In the new formulation, resource leveling and resource-constrained scheduling are performed simultaneously. The model presented uses the quadratic penalty function to transform the resource-scheduling problem to an unconstrained one. The algorithm is general and can be applied to a broad class of optimization problems. An illustrative example is presented to demonstrate the performance of the proposed method.
publisherAmerican Society of Civil Engineers
titleUse of Genetic Algorithms in Resource Scheduling of Construction Projects
typeJournal Paper
journal volume130
journal issue6
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2004)130:6(869)
treeJournal of Construction Engineering and Management:;2004:;Volume ( 130 ):;issue: 006
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record