contributor author | O. Moselhi | |
contributor author | A. Hassanein | |
date accessioned | 2017-05-08T20:37:17Z | |
date available | 2017-05-08T20:37:17Z | |
date copyright | December 2003 | |
date issued | 2003 | |
identifier other | %28asce%290733-9364%282003%29129%3A6%28664%29.pdf | |
identifier uri | http://yetl.yabesh.ir/yetl/handle/yetl/21454 | |
description abstract | This paper presents a model, designed to optimize scheduling of linear projects. The model employs a two-state-variable, | |
publisher | American Society of Civil Engineers | |
title | Optimized Scheduling of Linear Projects | |
type | Journal Paper | |
journal volume | 129 | |
journal issue | 6 | |
journal title | Journal of Construction Engineering and Management | |
identifier doi | 10.1061/(ASCE)0733-9364(2003)129:6(664) | |
tree | Journal of Construction Engineering and Management:;2003:;Volume ( 129 ):;issue: 006 | |
contenttype | Fulltext | |