Show simple item record

contributor authorMing Lu
contributor authorMichael Anson
contributor authorS. L. Tang
contributor authorY. C. Ying
date accessioned2017-05-08T20:36:59Z
date available2017-05-08T20:36:59Z
date copyrightOctober 2003
date issued2003
identifier other%28asce%290733-9364%282003%29129%3A5%28547%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/21299
description abstractNewly developed approaches for construction simulation have been used to model the one-plant-multisite ready mixed concrete (RMC) production system, validated by real-life operations data in Hong Kong.
publisherAmerican Society of Civil Engineers
titleHKCONSIM: A Practical Simulation Solution to Planning Concrete Plant Operations in Hong Kong
typeJournal Paper
journal volume129
journal issue5
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2003)129:5(547)
treeJournal of Construction Engineering and Management:;2003:;Volume ( 129 ):;issue: 005
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record