Show simple item record

contributor authorGeorge S. Birrell
date accessioned2017-05-08T20:36:32Z
date available2017-05-08T20:36:32Z
date copyrightSeptember 1985
date issued1985
identifier other%28asce%290733-9364%281985%29111%3A3%28244%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/21064
description abstractA large set of criteria by which top quality subcontractors evaluate the managerial performance of general contractors under whose management they have worked during the construction process and by which they may differentiate their bids to different generals for the same future project are listed and described. These criteria can also be seen as the intrinsic managerial, cost‐and time‐sensitive factors by which general contractors or any manager of construction could improve performance, competitiveness and profitability. It also describes separate, “most important” and “super‐important” subsets of the foregoing criteria/factors for office and site staff, etc., and the range of effects of the generals' good and bad managerial performance against these criteria/factors on the costs and duration of the subcontractors' work. The cost and duration effects, etc., that each lump sum bidding general contractor and appointed construction management agent has on the subcontractors' work are compared, and the carefully formatted research process which produced these results is outlined.
publisherAmerican Society of Civil Engineers
titleGeneral Contractors' Management: How Subs Evaluate IT
typeJournal Paper
journal volume111
journal issue3
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(1985)111:3(244)
treeJournal of Construction Engineering and Management:;1985:;Volume ( 111 ):;issue: 003
contenttypeFulltext


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record