Show simple item record

contributor authorPaul M. Goodrum
contributor authorCarl T. Haas
date accessioned2017-05-08T20:35:21Z
date available2017-05-08T20:35:21Z
date copyrightDecember 2002
date issued2002
identifier other%28asce%290733-9364%282002%29128%3A6%28463%29.pdf
identifier urihttp://yetl.yabesh.ir/yetl/handle/yetl/20454
description abstractDespite a decrease in industry level measures in construction productivity, there has been a steady increase in construction productivity at the activity level. This research examines equipment technology as one factor that may explain that increase. The relationship between changes in equipment technology and partial factor productivity is examined for 200 activities over a 22 year time period. Specifically, the paper examines the relative impact of different types of equipment technology for five technology factors: energy, control, functional range, information processing, and ergonomics. Through ANOVA and regression analyses, it is found that activities that experienced a significant change in equipment technology also witnessed substantially greater long-term improvements in partial factor productivity than those that did not experience a change.
publisherAmerican Society of Civil Engineers
titlePartial Factor Productivity and Equipment Technology Change at Activity Level in U.S. Construction Industry
typeJournal Paper
journal volume128
journal issue6
journal titleJournal of Construction Engineering and Management
identifier doi10.1061/(ASCE)0733-9364(2002)128:6(463)
treeJournal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 006