| description abstract | Numerous workers, equipment, material, temporary facilities, as well as permanent structures share the limited space during construction. Since space constraints may affect productivity and the critical path, it is essential to organize the available space efficiently and minimize space conflicts. This study considers space availability due to time and scheduling, productivity loss due to space constraints and path interference, as well as the possibility of alternative space to resolve these conflicts and optimize space usage. Herein, computer-aided design is integrated with scheduling software for the dynamic identification of space conflicts on the jobsite. Follow-up supplemental decision criteria are then provided for conflict analysis and resolution. A prototype decision support system that combines the criteria was developed to solve this significant and complex problem more efficiently and precisely. A case study demonstrates the use and development of this system, which is very helpful to engineers and project managers. | |
| publisher | American Society of Civil Engineers | |
| title | Identification and Resolution of Work Space Conflicts in Building Construction | |
| type | Journal Paper | |
| journal volume | 128 | |
| journal issue | 4 | |
| journal title | Journal of Construction Engineering and Management | |
| identifier doi | 10.1061/(ASCE)0733-9364(2002)128:4(287) | |
| tree | Journal of Construction Engineering and Management:;2002:;Volume ( 128 ):;issue: 004 | |
| contenttype | Fulltext | |